Total building demolition requires expert evaluation in order to be completed in the best possible way.  Careful consideration must be given to every aspect of the work site to prevent any possible hazards, along with providing proper protection to all and the environment.  Details such as size of buildings to their structural positions, or if any contamination may exist such as asbestos, are all factors that will contribute to determining the best method of demolition to be applied.

Our history of total building demolition and structural dismantling work comprises a wide range of customers both in the private sector and public, some of which includes:

  • Healthcare facilities—including hospitals with no disruption to patient care
  • Educational institutions—including active college campuses ensuring safety and smooth ongoing operations
  • Mills
  • Concrete and water treatment plants
  • Industrial
  • Commercial buildings
  • Residential

From initial survey to final seeding, FD develops a complete plan that ensures accurate estimating and smooth project execution throughout each demolition and construction stage.  We use project management tools to deliver efficiency regardless of the project size.

Our crews have the knowledge, training, experience, and equipment to safely and efficiently perform any total building demolition job.


BEFORE

Wegmans before

AFTER

total demolition